Victoria Park Transformation Plan released with high ropes courses, edible gardens, water play areas and pedestrian and cycle bridges have been included in the next exciting phase of the Victoria Park project.
Lord Mayor Adrian Schrinner today released the Victoria Park / Barrambin Draft Master Plan, which builds on the more than 51,000 ideas and feedback received from people during the Vision phase of the project.
“Brisbane is already recognised as Australia’s greenest capital city and our network of more than 2100 parks is a big part of the reason why,” Cr Schrinner said.
“Our plan for this parkland will further enhance that reputation, transforming 64-hectares of inner-city greenspace into an iconic destination.
“We want Victoria Park to be a place regularly visited by residents from right across Brisbane as well as a must-do experience for our visitors from across the world.
“It is extremely rare for a city the size of Brisbane to have an opportunity to transform a large slice of inner urban greenspace like this.
“That’s why we’re determined to do something so special.
“Over the park’s transformation we will increase tree canopy cover from 10 to 60 per cent, with more than 10,000 trees and shrubs already planted, including 80 native species.”
The Victoria Park/Barrambin Draft Master Plan includes new designs for a water-play areas, a tree house with panoramic views of the skyline and mountain ranges, a visitor centre and an edible garden.
The area’s natural environment will be restored and protected, under the Draft Master Plan.
Future works in the park will take into consideration the plans for the temporary equestrian cross country course and BMX freestyle events for the Brisbane 2032 Olympic and Paralympic Games.
“This will be an incredible venue during the Brisbane 2032 Games and Council has already been working with experts to ensure that the equestrian cross country course is integrated into the master plan,” Cr Schrinner said.
“Once the Games are over, the course will revert to public use and our plan for that part of the parkland will proceed.”
Residents have already begun discovering Victoria Park/Barrambin since it was reinstated as a public parkland.
Cr Schrinner said resident feedback will continue to inform the transformation of the parkland over coming years.
“This will be a park for everyone, of all ages and of all interests,” he said.
“When residents look at this Draft Master Plan they will discover our vision to deliver new experiences, exciting adventure, and connections with nature.
“This is Brisbane’s biggest new park in more than 50 years, and we want it to be a place for people to come together and create memories. “
Central Ward Councillor Vicki Howard said there were already works underway to enhance the parkland.
“Right now we’re getting ready to install new park furniture, shelters, picnic tables, barbecues and drinking fountains as we provide more opportunities for resident and visitors to visit the parkland and enjoy Brisbane’s outdoor lifestyle,” Cr Howard said.
“We had more than 15,000 people attend the parkland for the Green Heart Fair and thousands also attended as part of a recent Brisbane Festival event, “Voices of Vic Park”.
“Just last month we opened a brand-new direct access into the park from the Herston busway, making it even easier for people to visit and explore Brisbane’s biggest new park.
“The Draft Master Plan reveals the proposal for new connections through the park with accessible pathways and significant new pedestrian and cycle bridges that will connect Spring Hill and Herston, making it easier to get to and through the park via active travel.”
Feedback on the Draft Master Plan closes on Sunday 30 October 2022.
Download the Draft Master Plan at https://www.brisbane.qld.gov.au/things-to-see-and-do/council-venues-and-precincts/parks/victoria-park-barrambin
WHAT’S IN THE DRAFT MASTER PLAN?
- Adventure Valley – including mountain bike track and a high ropes course
- The Tree House lookout and café
- Upgraded pedestrian and bikeway bridge
- Nature water play gully
- Education Hub and Visitor Centre
- Water play area
- Reinstated water holes and wetlands
- Adventure playground
- Community sports precinct
- Community edible garden
HOW DO I HAVE MY SAY?
- visitbrisbane.qld.gov.au and search ‘Victoria Park’
- Call the 24/7 Contact Centre3403 8888
Events:
Ø 12 October and 19 October – consultation pop-up at Herston Busway
Ø 5 October – Community engagement in Queen Street Mall
Ø 11 October – Online engagement event, 6pm – registration essential via Eventbrite
Ø Saturday 15 October – 8am – 10 am Community engagement outside Centenary Pool – Gregory Terrace SPRING HILL
Ø 22 October – Discovery Day in the Park – Victoria Park, 10am to 2pm
Ø 29 October – Outdoor cinema and pop-up engagement event at Victoria Park
For more about our practical environmentalism achievements just visit https://vickihoward.com/koalacapital and www.brisbane.qld.gov.au